News from EPRA
DANIIE.CC representatives visited our office
We hosted representativs of DANNIE.CC in our office and discussed potential collaborations between DANNIE.CC and EPRA Energy.
We participated to DIgSILENT representatives meeting organized in Gomaringen office
We participated to DIgSILENT Representatives Meeting 2024 in Gomaringen office of DIgSILENT GmbH.
Many thanks to DIgSILENT team for the warm hospitality, great organization, and updates on the products …
Many thanks to representatives all over the world for productive and promising discussions …
We are very happy to be a member of DIgSILENT family …
New Project: Regional Demand Projection based on Econometric & S-Curve Techniques
Çalık Altyapı ve Elektrik Hizmetleri A.Ş preffered solutions of EPRA Energy for regional demand projection in the scope of grid master plan of YEDAŞ – Yeşilırmak Elektrik Dağıtım A.Ş. for the 2030-2035 period. Demand projection analysis will be based on econometric & s-curve techniques.
We participated at TÜREK 2024
Türkiye Wind Energy Congress (TÜREK) 2024, organized by the Türkiye Rüzgar Enerjisi Birliği (TÜREB) (Turkish Wind Energy Association (TWEA), of which we are a member, was very productive.
We would like to thank all sector participants who visited our stands and those whom we exchanged very useful ideas about our solutions in the renewables sector throughout the event.
PSS tuning & tests of ÇAN-2 TPP performed successfully
We successfully performed parameter tuning of the PSS (Power System Stabilizer) of Çan2 TPP to provide positive damping to both local (~1Hz) and inter-area (~0,15Hz) oscillations. We are happy to contribute improving stability of the Turkish power grid…
New Project: Grid Connection & Grid Code Compliance Analyses for 4 WPPs in Türkiye
Wind is blowing stronger for EPRA Energy this year!
Enerjisa Üretim preferred the quality of EPRA Energy for the grid connection and grid code compliance analysis of 4 important projects:
- ARTURNA-2 Wind Power Plant (WPP)
- FALP WPP
- GAIA WPP
- FALP WPP
Happy to support the secure, reliable, stable, and sustainable connections of renewables to power systems worldwide.
New Project: Grid Connection & Grid Code Compliance Analyses of Birkapılı Hybrid Power Plant (HPP + WPP)
Gazipaşa Enerji Üretim A.Ş. preferred quality of EPRA Energy for Grid Connection & Grid Code Compliance Analyses of Birkapılı Hybrid Power Plant. The study will analyse transformation of the existing Birkapılı Hydraulic Power Plant to a Hybrid Power Plant with wind turbines.
We participated in Wind Energy Hamburg
New Project: Frequency Stability Assessment System of Litgrid – Consulting and Programming Support
We are thrilled to announce that EPRA Energy is qualified by Litgrid for Consulting and Programming Support for the Frequency Stability Assessment System (FSAS) of Litgrid.
Happy to support the security, reliability, stability, and sustainability of power systems worldwide.
New Project: Grid Studies of a Utility Scale PV Solar Power Plant in Mauritius
Did you know dodo (Raphus cucullatus) is an extinct flightless bird that was endemic to the island of Mauritius, which is east of Madagascar in the Indian Ocean.
We did not either until we are qualified by INTEC Energy Solutions for Grid Studies in Mauritius.
The study will address impacts of a utility scale PV Solar Power Plant (SPP) on the Mauritius Power Grid to ensure secure, reliable, and affordable integration of the PV SPP to the grid.
By adding value to data with advanced modeling and analysis techniques, we are happy to support the transformation of power systems in a secure, reliable, sustainable and economical way worldwide.
Projects
EPRA has carried out more than 100 projects that involve R&D and high engineering services for numerous public and private sector institutions and organizations in Turkey and more than 10 countries with its advanced analytical competencies and technical skills covering a wide range of areas from analysis of short-term system dynamics to long-term market simulations in the electricity energy sector.
Regional Demand Projection based on Econometric & S-Curve Techniques
- Client: ÇAEHAŞ
- Country: Türkiye
- Year: Nov, 2024
Grid Connection & Grid Code Compliance Analyses for 4 WPPs in Türkiye
- Client: EnerjiSA Üretim
- Country: Türkiye
- Year: Sep, 2024
Grid Connection & Grid Code Compliance Analyses of Birkapılı Hybrid Power Plant (HPP + WPP)
- Client: Gazipaşa Enerji Üretim A.Ş.
- Country: Türkiye
- Year: Oct, 2024
Frequency Stability Assessment System of Litgrid – Consulting and Programming Support
- Client: Litgrid
- Country: Lithuania
- Year: Sep, 2024
Grid Studies of a Utility Scale PV Solar Power Plant in Mauritius
- Client: INTEC Energy Solutions
- Country: Mauritius
- Year: Sep, 2024
YEDAS DisCo GIS Model –> DigSilent PowerFactory Integration Update
- Client: YEDAS DisCo
- Country: Türkiye
- Year: Sep, 2024
Grid Analyses of 113 MW Goktepe Wind Power Plant in Türkiye
- Client: Polat Enerji
- Country: Türkiye
- Year: Sep, 2024
Bazian Power Plant – Protection Coordination of Substation Auxiliary System
- Client: TAURUS ENERGY
- Country: Irak
- Year: Sep, 2024
UEDAŞ DisCo – Grid Master Plan & Master Project (2025 – 2035)
- Client: MERAM DisCo
- Country: Türkiye
- Year: Aug, 2024