News from EPRA
New Project: A New Era in Energy Begins with Artificial Intelligence!

At Epra Energy, we are proud to be at the forefront of the digital transformation in the energy sector.
💡 We have launched our Artificial Intelligence Strategy and Roadmap for the Turkish Electricity Sector consultancy service in collaboration with Perita Analytics, a company renowned for its deep expertise in data science and AI.
New Project: Bandırma RES 6 MW Enercon E-175 EP5 turbine grid connection & compatibility analysis

New Project: Research Project on Hazardous Conditions in the Electrical Distribution Networks

The project aims to detect and classify hazardous conditions that may occur in electrical distribution networks, and to analyze their root causes in order to develop both preventive and corrective measures. The ultimate objective is to enhance personnel safety as well as the operational reliability of the power system.
New Project: 42 MW Alparslan2 Hybrid Power Plant (HPP & SPP) – Grid Code Compliance Analysis

New Project: Power System Analyses for Secure Power Export from Turkmenistan to Afghanistan

We are thrilled to announce our new project “Power System Analyses for Secure Power Export from Turkmenistan to Afghanistan” with Çalık Enerji in Turkmenistan.
The analyses include the following studies:
- Load flow analysis
- Short-circuit analysis (IEC 60909)
- Interconnection line reactive power compensation requirement analysis
- Switching overvoltage analysis
- Voltage stability analysis
- Transient stability analysis
- Special protection system requirement analysis
New Project: Grid Connection Analyses of 240 MW Sunrise PV Solar Power Plant in Azerbaijan

We are thrilled to announce our new project “Grid Connection Analyses of 240 MW Sunrise PV Solar Power Plant in Azerbaijan” with Intec in Azerbaijan.
The analyses include the following studies:
- Load flow analysis to check design ratings
- Short-circuit analysis (IEC 60909) to check design ratings
- Reactive power compliance assessment
- Evaluation of active & reactive control modes
- LVRT & HVRT assessment
- Power Quality studies
- Protection coordination
- Arc flash analysis
- Lightning protection risk assessment
- Insulation coordination
- Grounding study analysis
We are happy to continue contributing secure and reliable transition of the Azerbaijan power system.
New Project: Isolation Coordination of Naovi 3 Power Plant – Uzbekistan

We are excited to announce our new project with 3AB Enerji ve Sanayi Tesisleri Ticaret A.Ş.: Isolation Coordination of Naovi 3 Power Plant – Uzbekistan
New Project: Grid Connection & Grid Code Compliance Analyses of MEGA Solar PV Projects in Azerbaijan

We are thrilled to announce our new project “Grid Connection & Grid Code Compliance Analyses of Mega Solar PV Projects (315 MW Banka & 445 MW Bilasuvar Solar PV)” with NVVEPDI in Azerbaijan.
The analyses include the following studies for both mega PV solar projects:
- Grid impact of the Solar PV Power Plants (static / steady state & dynamic / stability & protection coordination)
- Reactive power capacity compliance
- Low-Voltage-Ride-Through (LVRT) compliance
- Active power control & response compliance
- Frequency control & response compliance
- Power quality measurements & impacts to grid
- Protection coordination design analysis of the power plants
Grid code compliance of MEGA renewable projects is important for the secure and reliable transition of power grids. We are happy to contribute such a secure and reliable transition of the Azerbaijan power system.
Kick off Meetings – Distribution Grid Modernization to Increase Distributed Renewables and Electric Charging Stations

We performed several meetings in the scope of kick off meetings of our new project with Arup and Azerisiq. Many thanks to Azerisiqi particularly Aras Bey, Hikmet Bey, and Mubariz Bey for the productive meetings and hospitality.
New Project: 94 MW Cemre Battery Storage Solar Power Plant – Grid Code Compliance Analysis

Saves Enerji preferred quality of EPRA Energy like many renewable energy investment companies in Türkiye.
Modeling and simulation studies will be performed with #DIgSILENT #PowerFactory in the scope of the grid code compliance analyses of the 94 MW Cemre Storage Solar Power Plant.
We are happy to support secure and reliable energy transformation of our grid.
Projects
EPRA has carried out more than 100 projects that involve R&D and high engineering services for numerous public and private sector institutions and organizations in Turkey and more than 10 countries with its advanced analytical competencies and technical skills covering a wide range of areas from analysis of short-term system dynamics to long-term market simulations in the electricity energy sector.
A New Era in Energy Begins with Artificial Intelligence!

- Client: Perita Analitik
- Country: Türkiye
- Year: Jun, 2025
Research Project on Hazardous Conditions in the Electrical Distribution Networks

- Client: Başkent EDAŞ
- Country: Türkiye
- Year: Jun, 2025
42 MW Alparslan2 Hybrid Power Plant (HPP & SPP) – Grid Code Compliance Analysis

- Client: Asunim Türkiye
- Country: Türkiye
- Year: Jun, 2025
Bandırma RES 6 MW Enercon E-175 EP5 turbine grid connection & compatibility analysis

- Client: EnerjiSa Üretim
- Country: Türkiye
- Year: May, 2025
Grid Connection & Grid Code Compliance Analyses of MEGA Solar PV Projects in Azerbaijan

- Client: NVVEPDI
- Country: Azerbaijan
- Year: Apr, 2025
Power System Analyses for Secure Power Export from Turkmenistan to Afghanistan

- Client: Çalık Enerji
- Country: Turkmenistan
- Year: May, 2025
Grid Connection Analyses of 240 MW Sunrise PV Solar Power Plant in Azerbaijan

- Client: INTEC Energy Solutions
- Country: Azerbaijan
- Year: May, 2025
Isolation Coordination of Navoi 3 Power Plant – Uzbekistan

- Client: 3AB Enerji ve Sanayi Tesisleri Ticaret A.Ş.
- Country: Uzbekistan
- Year: May, 2025
94 MW Cemre Battery Storage Solar Power Plant – Grid Code Compliance Analysis

- Client: Saves Enerji
- Country: Türkiye
- Year: Apr, 2025
LVRT & Frequency Control Analysis of 230 MW Garadagh – Solar Power Plant

- Client: AzerEnerji
- Country: Azerbaijan
- Year: Mar, 2025