Grid Code Compliance Tests of 100 MW Qobustan PV Solar Power Plant

Universal Energy Co., Ltd. preferred quality of EPRA for the Grid-Code Compliance (GCC) Tests of 100 MW Qobustan PV Solar Power Plant in Azerbaijan.


Scope of the GCC tests is to verify that the Power Plant meets the requirements defined in the Azerbaijan Grid Code.

Relevant Projects

Grid Connection & Grid Code Compliance Studies for 144 MWh Pasewalk BESS Project
Lodos Wind + 100 MW PV Solar Hybrid Power Plant: Grid Code Compliance Analysis
Protection Coordination of 100 MW Gobustan PV Solar Power Plant | Azerbaijan