Grid Impact & Grid Code Compliance Mega PV Solar Power Plant Projects in Türkiye

Acwa power preferred quality of Epra Energy for the “Grid Impact & Grid Code Compliance Analyses of Mega PV Solar Power Plant Projects in Türkiye”.

The analyses include the following modelling & simulation studies:

• PHASE-1: Power Evacuation:

o Interconnection System Modelling
o Definition of Simulation Scenarious
o Load Flow
o Connection Option Assessment
o Contingency (N-1/N-2)
o Preliminary Assessment for Reactive Power Reserve
o Short Circuit

• PHASE-2: Grid Compliance and ECA Stability:

o Grid code compliance:

 Reactive Power Compliance Assessment
 Low-Voltage-Ride-Through (LVRT) Assessment
 Evaluation of active power control
 Evaluation of frequency control (LFSM-O)
 Evaluation of reactive control
 Power Quality (Harmonic & Flicker)

o Stability for Emergency Control Automation
o Harmonic background measurement (IEC 61000-3-6)
o Power Quality (Harmonic & Flicker)

Relevant Projects

Protection Coordination of 100 MW Gobustan PV Solar Power Plant | Azerbaijan
PSS Tuning of Orhaneli Thermal Power Plant
Grid Impact Assessment of 160 MWac Solar PV Project in Hajiqabul