Scope of the project is to analyse transformation of the existing Birkapılı Hydraulic Power Plant to a Hybrid Power Plant with wind turbines.
Grid Connection & Grid Code Compliance Studies for 144 MWh Pasewalk BESS Project

- Client: Intec
- Country: Germany
- Year: Aug, 2026


