Grid Connection & Grid Code Compliance Analyses of Birkapılı Hybrid Power Plant (HPP + WPP)

Scope of the project is to analyse transformation of the existing Birkapılı Hydraulic Power Plant to a Hybrid Power Plant with wind turbines.

Relevant Projects

Grid Connection & Grid Code Compliance Studies for 144 MWh Pasewalk BESS Project
Lodos Wind + 100 MW PV Solar Hybrid Power Plant: Grid Code Compliance Analysis
Protection Coordination of 100 MW Gobustan PV Solar Power Plant | Azerbaijan