Regional demand projection in the scope of grid master plan of YEDAŞ – Yeşilırmak Elektrik Dağıtım A.Ş. for the 2030-2035 period, will be performed based on econometric & s-curve techniques.
Grid Connection & Grid Code Compliance Studies for 144 MWh Pasewalk BESS Project

- Client: Intec
- Country: Germany
- Year: Aug, 2026


