Feasibility of 250 MW Battery Energy Storage System (BESS) in Azerbaijan Grid

The study will address technical requirements from the BESS to support secure and reliable integration of renewables to Azerbaijan grid. Optimum location, size, and EMS controller requirements will also be addressed in the study.

Relevant Projects

42 MW Alparslan2 Hybrid Power Plant (HPP & SPP) – Grid Code Compliance Analysis
Research Project on Hazardous Conditions in the Electrical Distribution Networks
A New Era in Energy Begins with Artificial Intelligence!