Feasibility of 250 MW Battery Energy Storage System (BESS) in Azerbaijan Grid

The study will address technical requirements from the BESS to support secure and reliable integration of renewables to Azerbaijan grid. Optimum location, size, and EMS controller requirements will also be addressed in the study.

Relevant Projects

Afghanistan Power Grid Modelling, Planning and Power Plant Connection Analysis
Grid Connection, Grid Code Compliance & Power Quality Impact Analyses of 100 MW Gobustan Solar PV Project in Azerbaijan
Grid Code Compliance Analyses of 40 MW Lachendorf PV Solar Power Plant – Germany