The study will address technical requirements from the BESS to support secure and reliable integration of renewables to Azerbaijan grid. Optimum location, size, and EMS controller requirements will also be addressed in the study.
Grid Connection & Grid Code Compliance Studies for 144 MWh Pasewalk BESS Project

- Client: Intec
- Country: Germany
- Year: Aug, 2026


