Pre-Feasibility of Turkmenistan-Pakistan-Afghanistan (TAP) Transmission Corridor Project

Scope of the project includes;  Modelling of the grids (TAP) with DigSilent; Demand & generation forecasting (adequacy); Load flow and n-1 contingency analysis; Reliable power transmission limit calculations (NTC calculations); Transient stability analysis; Recommendations for the phases of the project

Relevant Projects

Afghanistan Power Grid Modelling, Planning and Power Plant Connection Analysis
Grid Connection, Grid Code Compliance & Power Quality Impact Analyses of 100 MW Gobustan Solar PV Project in Azerbaijan
Grid Code Compliance Analyses of 40 MW Lachendorf PV Solar Power Plant – Germany