Quasi-dynamic simulations will be performed in the scope of the study to assess secure and reliable capacity extension potential of the plant.
Grid Connection & Grid Code Compliance Studies for 144 MWh Pasewalk BESS Project

- Client: Intec
- Country: Germany
- Year: Aug, 2026


