Grid Analyses of 113 MW Goktepe Wind Power Plant in Türkiye

Quasi-dynamic simulations will be performed in the scope of the study to assess secure and reliable capacity extension potential of the plant.

Relevant Projects

Grid Connection & Grid Code Compliance Studies for 144 MWh Pasewalk BESS Project
Lodos Wind + 100 MW PV Solar Hybrid Power Plant: Grid Code Compliance Analysis
Protection Coordination of 100 MW Gobustan PV Solar Power Plant | Azerbaijan