Bazian Power Plant – Protection Coordination of Substation Auxiliary System

In the scope of the study, current protection coordination of the plant substation auxiliary system will be assessed and amendments will be recommended to improve reliability of the power plant operation.

Relevant Projects

Grid Connection & Grid Code Compliance Studies for 144 MWh Pasewalk BESS Project
Lodos Wind + 100 MW PV Solar Hybrid Power Plant: Grid Code Compliance Analysis
Protection Coordination of 100 MW Gobustan PV Solar Power Plant | Azerbaijan