AVR & PSS Tuning & Tests of ÇAN-2 TPP

In the scope of the project, parameter settings of the AVR & PSS of the plant will be tuned and tested to ensure positive damping (or at least prevent negative damping ) to both local (~1Hz) and inter-area (~0,15Hz) oscillations to contribute improving stability of the Turkish power grid.