UEDAŞ DisCo – Grid Master Plan & Master Project (2025 – 2035)

In the scope of the project, EPRA Energy and ELEN-SAN will lead “Master Plan” and “Master Project” studies, respectively, for the 2025-2030 horizon in coordination. This coordination will ensure assessment of grid investment requirements from both analytical and field constraints perspectives. Master Plan studies include:

  • Data collection for modelling
  • Demand projection
  • Planning criteria
  • Modelling of the grid with DIgSILENT PowerFactory
  • Grid analysis
  • Prioritization of the grid investment requirements
  • CAPEX reports

Relevant Projects

Regional Demand Projection based on Econometric & S-Curve Techniques
Grid Connection & Grid Code Compliance Analyses of Birkapılı Hybrid Power Plant (HPP + WPP)
Grid Connection & Grid Code Compliance Analyses for 4 WPPs in Türkiye