Ukraine and Moldova Isolated Mode of Operation

Scope of this study includes; Dynamic modelling of Ukraine & Moldova grid for FCR and FRR analysis; Recommended FCR distribution strategies and ancillary services within the decoupling of the Ukrainian grid; Modelling of typical continuous load-generation imbalance characteristics of the Ukraine power system; Recommended strategies for aFRR allocation and AGC system operation (settings, etc.) for island operation of UA-MD control block; Recommended strategies for special protection schemes and intentional network splitting; Participation in meetings ENTSO-E project group, and support  presentations minutes of meetings.

Relevant Projects

Afghanistan Power Grid Modelling, Planning and Power Plant Connection Analysis
Grid Connection, Grid Code Compliance & Power Quality Impact Analyses of 100 MW Gobustan Solar PV Project in Azerbaijan
Grid Code Compliance Analyses of 40 MW Lachendorf PV Solar Power Plant – Germany