Scope of the project includes; Network modelling with DigSilent PowerFactory software; Static security and techno-economic calculations of new 500 kV transmission grid investments; Feasibility study on new investments in terms of contribution to reliable power transmission limits (NTC); Mid- and long-term regional demand forecasting and generation adequacy assessment
Grid Connection & Grid Code Compliance Studies for 144 MWh Pasewalk BESS Project

- Client: Intec
- Country: Germany
- Year: Aug, 2026