Scope of the analyses includes settings of protection relays at the high voltage substation and the power plant auxiliary system.
Grid Connection & Grid Code Compliance Studies for 144 MWh Pasewalk BESS Project

- Client: Intec
- Country: Germany
- Year: Aug, 2026


