Scope of the project includes; Modelling of the grids (TAP) with DigSilent; Demand & generation forecasting (adequacy); Load flow and n-1 contingency analysis; Reliable power transmission limit calculations (NTC calculations); Transient stability analysis; Recommendations for the phases of the project
Grid Code Compliance Tests of 240 MW Khizi & Absheron Wind Power Project in Azerbaijan

- Client: Powerchina
- Country: Azerbaijan
- Year: Aug, 2025