Scope of the project includes; Modelling of the grids (TAP) with DigSilent; Demand & generation forecasting (adequacy); Load flow and n-1 contingency analysis; Reliable power transmission limit calculations (NTC calculations); Transient stability analysis; Recommendations for the phases of the project
42 MW Alparslan2 Hybrid Power Plant (HPP & SPP) – Grid Code Compliance Analysis

- Client: Asunim Türkiye
- Country: Türkiye
- Year: Jun, 2025