Scope of this study includes; Developing the certification procedure and steps for certification of generation; Site visit to major power plants in Moldova to collect data for dynamic controllers and investigate on-site model verification and certification tests; Summary assessment report for ancillary service capability and possibility of performing the testing of Moldova Power Units including recommendations for a tentative testing plan for the selected generation units and update of general procedure, if necessary, based on findings on-site
Grid Connection & Grid Code Compliance Studies for 144 MWh Pasewalk BESS Project

- Client: Intec
- Country: Germany
- Year: Aug, 2026


