Integrating GIS grid model of AKEDAS DisCo with DIgSILENT PowerFactory

Like many distribution companies (DisCo) in Türkiye, AKEDAŞ Elektrik Dağıtım A.Ş. (DisCo) preferred EPRA Energy for integrating its Geographic Information System (GIS) with DIgSILENT PowerFactory. Python based algorithms developed by EPRA enables AKEDAS DisCo to report errors in GIS model (if any) and transform the GIS model to DIgSILENT PowerFactory model ready for grid analysis automatically.