Feasibility of 250 MW Battery Energy Storage System (BESS) in Azerbaijan Grid

The study will address technical requirements from the BESS to support secure and reliable integration of renewables to Azerbaijan grid. Optimum location, size, and EMS controller requirements will also be addressed in the study.

Relevant Projects

Grid Code Compliance Tests of 240 MW Khizi & Absheron Wind Power Project in Azerbaijan
410 MW Edirne Wind Power Plant – Grid Connection & Grid Code Compliance Analyses
340 MW Balkaya Wind Power Plant – Grid Connection & Grid Code Compliance Analyses