Efficient integration of wind and solar power in Turkiye – Update Study for 2030

Operational challenges introduced by high penetration of renewables for the 2030 target year are addressed through market and network simulations. Market & Network simulation tool, which is developed by EPRA are utilized in the project for commercial commitment and dispatching of generators based on merit orders. 

Relevant Projects

Protection Coordination of 100 MW Gobustan PV Solar Power Plant | Azerbaijan
PSS Tuning of Orhaneli Thermal Power Plant
Grid Impact Assessment of 160 MWac Solar PV Project in Hajiqabul