Efficient integration of wind and solar power in Turkiye – Update Study for 2030

Operational challenges introduced by high penetration of renewables for the 2030 target year are addressed through market and network simulations. Market & Network simulation tool, which is developed by EPRA are utilized in the project for commercial commitment and dispatching of generators based on merit orders. 

Relevant Projects

Grid Connection & Grid Code Compliance Studies for 144 MWh Pasewalk BESS Project
Lodos Wind + 100 MW PV Solar Hybrid Power Plant: Grid Code Compliance Analysis
Protection Coordination of 100 MW Gobustan PV Solar Power Plant | Azerbaijan