Scope of this study includes; Evaluation of new settings for PSSs and AVR-SDs; Development of the program for tuning and testing; Application of the new settings in the field
Grid Connection & Grid Code Compliance Studies for 144 MWh Pasewalk BESS Project

- Client: Intec
- Country: Germany
- Year: Aug, 2026


