Scope of the project includes 1) Data collection & grid modelling (DigSilent PowerFactory); 2) Static model (target year 2025); 3) Dynamic model (target year 2025); 4) Data freeze (assumptions for unavailable data); 5) Grid analyses (a. Static analyses (Load flow, short circuit)), b. Dynamic analyses (Transient stability, voltage stability); 6) CO2 emission analyses (diesel generator vs HPP); 7) Smart grid requirement analyses (SPS, SVC, FACTs, etc.) based on the results of grid analyses.
Protection Coordination of 100 MW Gobustan PV Solar Power Plant | Azerbaijan

- Client: Universal Energy
- Country: Azerbaijan
- Year: Jun, 2026


