94 MW Cemre Battery Storage Solar Power Plant – Grid Code Compliance Analysis

Grid code compliance studies include:

  • Reactive Power Capacity
  • Low-Voltage-Ride-Through (LVRT)
  • Active power control
  • Frequency control
  • Voltage control
  • Power quality analysis (harmonic load flow)

In addition, layout optimization and technical loss analysis will be performed in the scope of the project.