EPRA is qualified by Çalık Enerji for performing; i) Static and dynamic analysis for grid compliance analysis for integration of 400 MW and 600 MW solar plants at Sub-Saharan Africa (Democratic Kongo Republic), including development of static and dynamic model Democratic Kongo Republic; ii) Stability analyses (frequency control, voltage control, low-voltage right-through analysis, etc.); iii) Capacity building trainings to transmission grid company on modelling and grid compliance analyses with DigSilent PF.
Grid Code Compliance Tests of 240 MW Khizi & Absheron Wind Power Project in Azerbaijan

- Client: Powerchina
- Country: Azerbaijan
- Year: Aug, 2025