Scope of the analyses includes settings of protection relays at the high voltage substation and the power plant auxiliary system.
42 MW Alparslan2 Hybrid Power Plant (HPP & SPP) – Grid Code Compliance Analysis

- Client: Asunim Türkiye
- Country: Türkiye
- Year: Jun, 2025