LVRT & Frequency Control Analysis of 230 MW Garadagh – Solar Power Plant

The study, which will be performed with DIgSILENT PowerFactory, will investigate Low Voltage Ride Through (LVRT) and Frequency Control (FC) capabilities of the Solar Power Plant in terms of the Azerbaijan Grid Code and Power Purchase Agreement (PPA) of the plant.

Relevant Projects

Grid Code Compliance Tests of 240 MW Khizi & Absheron Wind Power Project in Azerbaijan
410 MW Edirne Wind Power Plant – Grid Connection & Grid Code Compliance Analyses
340 MW Balkaya Wind Power Plant – Grid Connection & Grid Code Compliance Analyses