Objective of the study is to verify that the equipment in the plant substation and its connection with the grid is appropriate in terms of over-voltage caused by switching and lightning surges.
42 MW Alparslan2 Hybrid Power Plant (HPP & SPP) – Grid Code Compliance Analysis

- Client: Asunim Türkiye
- Country: Türkiye
- Year: Jun, 2025