Grid Connection Analyses of 240 MW Sunrise PV Solar Power Plant in Azerbaijan

Scope of the project includes the following studies:

  • Load flow analysis to check design ratings
  • Short-circuit analysis (IEC 60909) to check design ratings
  • Reactive power compliance assessment
  • Evaluation of active & reactive control modes
  • LVRT & HVRT assessment
  • Power Quality studies
  • Protection coordination
  • Arc flash analysis
  • Lightning protection risk assessment
  • Insulation coordination
  • Grounding study analysis

Relevant Projects

Grid Code Compliance Tests of 240 MW Khizi & Absheron Wind Power Project in Azerbaijan
410 MW Edirne Wind Power Plant – Grid Connection & Grid Code Compliance Analyses
340 MW Balkaya Wind Power Plant – Grid Connection & Grid Code Compliance Analyses