Following grid-code compliance tests on-site will be performed to check whether the turbines and power plant controller of the powerplant satisfy the requirements defined in the Azerbaijan Grid Code:
- Pre-Test Planning and Coordination
- Fault Ride Through (FRT) Parameter Verification
- Active Power and Frequency Control Tests
- Reactive Power and Voltage Control Capability Tests
- Power Quality Measurement and Analysis