Efficient integration of wind and solar power in Turkiye – Update Study for 2030

Operational challenges introduced by high penetration of renewables for the 2030 target year are addressed through market and network simulations. Market & Network simulation tool, which is developed by EPRA are utilized in the project for commercial commitment and dispatching of generators based on merit orders. 

Relevant Projects

Grid Code Compliance Tests of 240 MW Khizi & Absheron Wind Power Project in Azerbaijan
410 MW Edirne Wind Power Plant – Grid Connection & Grid Code Compliance Analyses
340 MW Balkaya Wind Power Plant – Grid Connection & Grid Code Compliance Analyses