42 MW Alparslan2 Hybrid Power Plant (HPP & SPP) – Grid Code Compliance Analysis

Grid code compliance studies include:

  • Reactive Power Capacity
  • Low-Voltage-Ride-Through (LVRT)
  • Active power control
  • Frequency control
  • Voltage control
  • Power quality analysis (harmonic load flow)

Relevant Projects

Grid Code Compliance Tests of 240 MW Khizi & Absheron Wind Power Project in Azerbaijan
410 MW Edirne Wind Power Plant – Grid Connection & Grid Code Compliance Analyses
340 MW Balkaya Wind Power Plant – Grid Connection & Grid Code Compliance Analyses