We are thrilled to announce our new project “Grid Code Compliance Analyses of 40 MW Lachendorf PV Solar Power Plant in Germany. The analyses include the following studies:
- Load flow analysis to check design ratings
- Short-circuit analysis (IEC 60909) to check design ratings
- Reactive power compliance assessment
- Evaluation of active & reactive control modes
- LVRT & HVRT assessment
- Protection coordination
- Lightning protection risk assessment
- Insulation coordination
- Grounding study analysis
- Auxiliary load calculation report
We are happy to continue contributing secure and reliable connection of renewables to grids worldwide.
