Objective of the study is to verify that the equipment in the plant substation and its connection with the grid is appropriate in terms of over-voltage caused by switching and lightning surges.
Grid Connection & Grid Code Compliance Analyses of Birkapılı Hybrid Power Plant (HPP + WPP)
- Client: Gazipaşa Enerji Üretim A.Ş.
- Country: Türkiye
- Year: Oct, 2024