Integration of GIS System of TOROSLAR DisCo with DIgSILENT PowerFactory

Like many distribution companies (DisCo) in Türkiye, TOROSLAR DisCo preffered solutions of EPRA for integrating its Geographic Information System (GIS) with DIgSILENT PowerFactory power system simulation software. Python based algorithms developed by EPRA for this integration not only enables power system analyses with the update GIS model of the grid but also contributes automatic identification of the missing / incorrect data and semiautomatic correction in the GIS Systen which is critical for other analyses as well.