Azerbaijan Energy Transition – Phase II

The project is the follow up of our previous project with AzerEnerji which was satisfactorily completed by the end of 2024. Scope of Phase II includes; addressing operational aspects of the Azerbaijan power grid under integration of large-scale renewable energy sources (RES); Capacity building of AzerEnergy staff for operation of the power grid under large-scale […]

YEDAS DisCo GIS Model –> DigSilent PowerFactory Integration Update

YEDAŞ – Yeşilırmak Elektrik Dağıtım A.Ş. (DisCo) preffered solutions of EPRA Energy for integrating its Geographic Information System (GIS) Model with its power system simulation software DIgSILENT PowerFactory. Python based algorithms developed by EPRA Energy enables YEDAS DisCo automatic reporting of errors in the GIS model (if any) and automatic transformation of the GIS model […]

Integrating GIS grid model of AKEDAS DisCo with DIgSILENT PowerFactory

Like many distribution companies (DisCo) in Türkiye, AKEDAŞ Elektrik Dağıtım A.Ş. (DisCo) preferred EPRA Energy for integrating its Geographic Information System (GIS) with DIgSILENT PowerFactory. Python based algorithms developed by EPRA enables AKEDAS DisCo to report errors in GIS model (if any) and transform the GIS model to DIgSILENT PowerFactory model ready for grid analysis […]

TAŞELİ RENEWABLE ZONE – Grid Connection Analyses

Aim of the project is to analyse secure and reliable integration of 10 GW wind + 10 GW PV solar capacity at Taşeli Renewable Zone to Turkish power system until 2028. Scope of the project includes: 1) Data collection; 2) Data freezing and assumptions; 3) Modeling studies (TÜREB Scenario for the target years 2025, 2030 […]