At Epra Energy, we are proud to be at the forefront of the digital transformation in the energy sector. 💡 We have launched our Artificial Intelligence Strategy and Roadmap for the Turkish Electricity Sector consultancy service in collaboration with Perita Analytics, a company renowned for its deep expertise in data science and AI. With this […]
Grid Connection & Grid Code Compliance Analyses of MEGA Solar PV Projects in Azerbaijan

Grid Connection & Grid Code Compliance Analyses of Mega Solar PV Projects in Azerbaijan: The analyses include the following studies for both mega PV solar projects: Grid code compliance of MEGA renewable projects is important for the secure and reliable transition of power grids. We are happy to contribute such a secure and reliable transition […]
Grid Connection Analyses of 240 MW Sunrise PV Solar Power Plant in Azerbaijan

Scope of the project includes the following studies:
Isolation Coordination of Navoi 3 Power Plant – Uzbekistan

Objective of the study is to verify that the equipment in the plant substation and its connection with the grid is appropriate in terms of over-voltage caused by switching and lightning surges.
LVRT & Frequency Control Analysis of 230 MW Garadagh – Solar Power Plant

The study, which will be performed with DIgSILENT PowerFactory, will investigate Low Voltage Ride Through (LVRT) and Frequency Control (FC) capabilities of the Solar Power Plant in terms of the Azerbaijan Grid Code and Power Purchase Agreement (PPA) of the plant.
Grid Code Compliance Analysis 240 MW Khizi – Absheron Wind Power Project

Grid code compliance studies include:
Feasibility of 250 MW Battery Energy Storage System (BESS) in Azerbaijan Grid

The study will address technical requirements from the BESS to support secure and reliable integration of renewables to Azerbaijan grid. Optimum location, size, and EMS controller requirements will also be addressed in the study.
Azerbaijan Energy Transition – Phase II

The project is the follow up of our previous project with AzerEnerji which was satisfactorily completed by the end of 2024. Scope of Phase II includes; addressing operational aspects of the Azerbaijan power grid under integration of large-scale renewable energy sources (RES); Capacity building of AzerEnergy staff for operation of the power grid under large-scale […]
Grid Connection & Grid Code Compliance Analyses for 4 WPPs in Türkiye

Scope of the project is to analyse grid connection and grid code compliance analysis of 4 important projects:
Grid Connection & Grid Code Compliance Analyses of Birkapılı Hybrid Power Plant (HPP + WPP)

Scope of the project is to analyse transformation of the existing Birkapılı Hydraulic Power Plant to a Hybrid Power Plant with wind turbines.