A New Era in Energy Begins with Artificial Intelligence!

At Epra Energy, we are proud to be at the forefront of the digital transformation in the energy sector. 💡 We have launched our Artificial Intelligence Strategy and Roadmap for the Turkish Electricity Sector consultancy service in collaboration with Perita Analytics, a company renowned for its deep expertise in data science and AI. With this […]
Research Project on Hazardous Conditions in the Electrical Distribution Networks

The project aims to detect and classify hazardous conditions that may occur in electrical distribution networks, and to analyze their root causes in order to develop both preventive and corrective measures. The ultimate objective is to enhance personnel safety as well as the operational reliability of the power system.
42 MW Alparslan2 Hybrid Power Plant (HPP & SPP) – Grid Code Compliance Analysis

Grid code compliance studies include:
Bandırma RES 6 MW Enercon E-175 EP5 turbine grid connection & compatibility analysis

Grid Connection & Grid Code Compliance Analyses of MEGA Solar PV Projects in Azerbaijan

Grid Connection & Grid Code Compliance Analyses of Mega Solar PV Projects in Azerbaijan: The analyses include the following studies for both mega PV solar projects: Grid code compliance of MEGA renewable projects is important for the secure and reliable transition of power grids. We are happy to contribute such a secure and reliable transition […]
Power System Analyses for Secure Power Export from Turkmenistan to Afghanistan

Scope of the project includes the following studies:
Grid Connection Analyses of 240 MW Sunrise PV Solar Power Plant in Azerbaijan

Scope of the project includes the following studies:
Isolation Coordination of Navoi 3 Power Plant – Uzbekistan

Objective of the study is to verify that the equipment in the plant substation and its connection with the grid is appropriate in terms of over-voltage caused by switching and lightning surges.
94 MW Cemre Battery Storage Solar Power Plant – Grid Code Compliance Analysis

Grid code compliance studies include: In addition, layout optimization and technical loss analysis will be performed in the scope of the project.
LVRT & Frequency Control Analysis of 230 MW Garadagh – Solar Power Plant

The study, which will be performed with DIgSILENT PowerFactory, will investigate Low Voltage Ride Through (LVRT) and Frequency Control (FC) capabilities of the Solar Power Plant in terms of the Azerbaijan Grid Code and Power Purchase Agreement (PPA) of the plant.